Abuzeinab, A, Arif, M, Kulonda, D J and Awuzie, B O (2016) Green business models transformation: Evidence from the UK construction sector. Built Environment Project and Asset Management, 6(05), 478-90.

Cheng, J C P and Venkataraman, V (2016) Analyzing relationships between project team compositions and green building certification in green building projects. Built Environment Project and Asset Management, 6(05), 449-61.

Ekanayake, E M K and Perera, B A K S (2016) Appropriate delay analysis techniques to analyse delays in road construction projects in Sri Lanka. Built Environment Project and Asset Management, 6(05), 521-34.

  • Type: Journal Article
  • Keywords: Sri Lanka,criteria,as-planned vs as-built analysis,delay analysis techniques,road construction,window analysis
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/BEPAM-08-2015-0039
  • Abstract:
    Purpose Delays represent one of the most critical factors that affect the cost of a construction project. They have to be therefore analysed comprehensively using appropriate techniques. The purpose of this paper is to find out the delay analysis techniques (DATs) that are most commonly used in road projects in Sri Lanka, the extent of their usage, the criteria that can be used in selecting them and the technique that is most appropriate for the selection. Design/methodology/approach The research methodology adopted included an extensive literature review, expert interviews and a questionnaire survey. Findings In road projects in Sri Lanka, five types of DATs are mainly used. The “As-planned v. As-built Analysis” technique is the most commonly used technique while “Window Analysis” is the least used technique. Out of the nine criteria identified for selecting a DAT, the most important criterion is the acceptability of the technique to courts and tribunals. “Window Analysis” was found to be the most appropriate DAT that can be used in road construction projects in Sri Lanka. Originality/value “Window Analysis” can be recommended as the most appropriate DAT for road projects in Sri Lanka.

Mallawaarachchi, H, De Silva, L and Rameezdeen, R (2016) Indoor environmental quality and occupants’ productivity: Suggestions to enhance national green certification criteria. Built Environment Project and Asset Management, 6(05), 462-77.

Pantzartzis, E, Deka, L, Price, A D F, Tann, C, Mills, G R W and Rich-Mahadkar, S (2016) Sustainable management of NHS assets backlog maintenance. Built Environment Project and Asset Management, 6(05), 535-52.

Patil, N A and Laishram, B S (2016) Sustainability of Indian PPP procurement process: Development of strategies for enhancement. Built Environment Project and Asset Management, 6(05), 491-507.

Waidyasekara, K G A S, De Silva, L and Rameezdeen, R (2016) Water use efficiency and conservation during construction: Drivers, barriers and practices. Built Environment Project and Asset Management, 6(05), 553-66.

Zin, Z M I, Kulatunga, U and Thayaparan, M (2016) Malaysian experience with public-private partnership: Managing unsolicited proposal. Built Environment Project and Asset Management, 6(05), 508-20.